Why Hardwood is the Required Material
There are around 380,000 listed buildings in England, with Grade II buildings making up approximately 92% of all listed buildings in the UK.For the vast majority of these properties, timber is not just the preferred choice — it is the only acceptable one.
Where window replacement is agreed, local planning authorities expect the replacement to use a suitable hardwood, European softwood, or metal. uPVC will not be considered acceptable. Traditional timber is often the preferred — and sometimes the only — material choice in conservation contexts. This preference is rooted in historical authenticity: timber has been a fundamental building material for centuries, and virtually all properties historically featured timber windows.
Working with Architects & Heritage Specialists
We work directly with architects, heritage consultants, conservation officers and main contractors on listed building and conservation area projects. We understand the documentation these projects require and can support your specification process with:
- Full product specification sheets
- Technical drawings and CAD files on request
- CE marked windows and doors — certification ready for planning submissions
- Supply only or supply and install — depending on your project requirements
When Does a Conservatory Require Planning Permission?
You’ll need planning permission if:
- The conservatory is at the front of the house or faces a road.
It doesn’t meet the following criteria:
Size limits:
- Detached houses: extension can’t extend more than 4 metres from the rear wall (or up to 8 metres with prior approval).
- Semi-detached/terraced: 3 metres (or up to 6 metres with prior approval).
Height:
- Maximum height of 4 metres.
- If within 2 metres of a boundary, the height must not exceed 3 metres.
Conservatory Planning Permission continued
- Coverage: The total area of all extensions and outbuildings must not cover more than 50% of the land around the original house.
- Storeys: Must be single-storey only.
- Materials: Should be similar in appearance to the existing house.
- Your property is a flat, maisonette, or converted building (permitted development rights usually don’t apply).
- You live in a designated area (e.g. conservation area, national park, Area of Outstanding Natural Beauty), where stricter rules apply.
- The property is a listed building (you’ll likely also need listed building consent).
- Previous extensions have already used up your permitted development allowance.
Let’s Discuss Your Next Project
Contact Country Hardwood today to discuss how we can help you with your next project.



